CEMENT FACTORIES
- ÇANAKKALE AKÇANSA CEMENT FACTORY
(2006-2008)
Production line works.
- KIRKLARELI TRAÇIM CEMENT FACTORY
(2018)
8500 tons of installation.
- SOMA CEMENT FACTORY
(2018)
Assembling and installation.
- ORDU ÜNYE CEMENT FACTORY
(1996)
Pipe Conveyer installation.
- DENIZLI CEMENT FACTORY
(1996)
Assembling and installation.
- ÇANAKKALE CEMENT FACTORY
(1995)
Assembling and installation.
PIPELINES
- BAKU TIBILISK CEYHAN CRUDE OIL PIPELINE PROJECT
(2003-2006)
Lot B section 455 km 42″ pipeline welding, coating and mechanical works.
GENERAL INDUSTRY APPLICATIONS
- BOSCH REFRIGERATOR FACTORY
Tekirdağ/TURKIYE (2006-2007)
Complete HVAC system design installation and commissioning
- BOSCH OWEN and WASHING MASCHINE FACTORY
Tekirdağ/TURKIYE (2006-2007)
Complete HVAC system design installation and commissioning
POWER PLANTS
- AKENERJİ ÇERKEZKÖY POWER PLANT (100 MW) (2001)
Fire Fightning System design, purchase, installation and commissioning.
- AKENERJİ UŞAK POWER PLANT (70 MW) (2004)
15.000 m. Steam Distribution Lines (including complete steel structure)
design, purchase, installation and commissioning
- AKENERJİ BOZUYUK POWER PLANT (90 MW) (2004)
HP-LP Steamlines design, purchase, installation and commissioning
NAPHTA –DIESEL-NATURAL GAS fuel systems design,
purchase, installation and commissioning
NAPHTA –DIESEL tanks manufacturing,fire fightning systems design,
purchase, installation andcommissionin
- AKENERJİ YALOVA POWER PLANT (2005)
SULZER-I and SULZER-II boilers installatıon
2.000 m. Fuell ines design, purchase, installation and commissioning
SteamTurbineMaintenance
- AKENERJİ ZONGULDAK (2005)
ByPassStackManufacturingandinstallation
Plant Complete Fire Fightning System design,
purchase, installation and commissioning
- ÇERKEZKÖY ENERJİ 50 MW COGENERATION POWER PLANT (2005-2006)
HRSG installation and commissioning
Boiler feedwatersystemdesign, purchase, installation and commissioning
5.000 m steamdistributionlinesdesign, purchase, installation and commissioning
CompleteFire FightningSystem design, purchase, installation and commissioning
- MARMARA ENERJİ POWER PLANT 25 MW 1st STAGE (2008)
Design,manufacturing, purchase, installation and commissioning of
3 by-pass stack and ventilatio nsystem of Wartsila Gas Engines
3.000 m steampipeline design,manufacturing, purchase, installation and commissioning.
- UĞUR ENERJİ 60 MW COMBINED CYCLE POWER PLANT (2009 -2010)
Purchase and construction contractor
for complete mechanical and electrical scope of power plant
- ACARSOY ENERJİ DENİZLİ (2010)
Basic & detail engineering for 126 mw
(1 gas turbine + 1hrsg+1 steam turbine) combined cycle power plant
- MARMARA ENERJİ
Engineering and mechanical construction contractor for additional 30 mw project
PAPER FACTORIES
- LİLA PAPER FACTORY
Tekirdağ (2008)
ConvertingSystem Completemechanical purchase,
installation and commissioning of paper factory with capacity of 20.000 t/year
Mechanical Installation and commissioning of paperfactory at 70.000 t/year
- RİBATEK PAPER FACTORY
Çerkezköy/Tekirdağ (2008)
Mechanical installation and commissioning of
SPUNLACE paper factory with capacity10.000 t/year