CEMENT FACTORIES
  • ÇANAKKALE AKÇANSA CEMENT FACTORY

(2006-2008)
Production line works.

  • KIRKLARELI TRAÇIM CEMENT FACTORY

(2018)
8500 tons of  installation.

  • SOMA CEMENT FACTORY

(2018)
Assembling and installation.

  • ORDU ÜNYE CEMENT FACTORY

(1996)
Pipe Conveyer installation.

  • DENIZLI CEMENT FACTORY

(1996)
Assembling and installation.

  • ÇANAKKALE CEMENT FACTORY

(1995)
Assembling and installation.

PIPELINES
  • BAKU TIBILISK CEYHAN CRUDE OIL PIPELINE PROJECT

(2003-2006)
Lot B section 455 km 42″ pipeline welding, coating and mechanical works.

GENERAL INDUSTRY APPLICATIONS
  •  BOSCH REFRIGERATOR FACTORY

Tekirdağ/TURKIYE (2006-2007)
Complete HVAC system design installation and commissioning

  • BOSCH OWEN and WASHING MASCHINE FACTORY

Tekirdağ/TURKIYE (2006-2007)
Complete HVAC system design installation and commissioning

POWER PLANTS
  •  AKENERJİ ÇERKEZKÖY POWER PLANT (100 MW) (2001)

Fire Fightning System design, purchase, installation and commissioning.

  • AKENERJİ UŞAK POWER PLANT (70 MW) (2004)

15.000 m. Steam Distribution Lines (including complete steel structure)
design, purchase, installation and commissioning

  • AKENERJİ BOZUYUK POWER PLANT (90 MW) (2004)

HP-LP Steamlines design, purchase, installation and commissioning
NAPHTA –DIESEL-NATURAL GAS fuel systems design,
purchase, installation and commissioning
NAPHTA –DIESEL tanks manufacturing,fire fightning systems design,
purchase, installation andcommissionin

  •   AKENERJİ YALOVA POWER PLANT (2005)

SULZER-I and SULZER-II boilers installatıon
2.000 m. Fuell ines design, purchase, installation and commissioning
SteamTurbineMaintenance

  •   AKENERJİ ZONGULDAK (2005)

ByPassStackManufacturingandinstallation
Plant Complete Fire Fightning System design,
purchase, installation and commissioning

  •   ÇERKEZKÖY ENERJİ 50 MW COGENERATION POWER PLANT (2005-2006)

HRSG installation and commissioning
Boiler feedwatersystemdesign, purchase, installation and commissioning
5.000 m steamdistributionlinesdesign, purchase, installation and commissioning
CompleteFire FightningSystem design, purchase, installation and commissioning

  •   MARMARA ENERJİ POWER PLANT 25 MW 1st STAGE (2008)

Design,manufacturing, purchase, installation and commissioning of
3 by-pass stack and ventilatio nsystem of Wartsila Gas Engines
3.000 m steampipeline design,manufacturing, purchase, installation and commissioning.

  •   UĞUR ENERJİ 60 MW COMBINED CYCLE POWER PLANT (2009 -2010)

Purchase and construction contractor
for complete mechanical and electrical scope of power plant

  •   ACARSOY ENERJİ DENİZLİ (2010)

Basic & detail engineering for 126 mw
(1 gas turbine + 1hrsg+1 steam turbine) combined cycle power plant

  •   MARMARA ENERJİ

Engineering and mechanical construction contractor for additional 30 mw project

PAPER FACTORIES
  • LİLA PAPER FACTORY

Tekirdağ (2008)
ConvertingSystem Completemechanical purchase,
installation and commissioning of paper factory with capacity of 20.000 t/year
Mechanical Installation and commissioning of paperfactory at 70.000 t/year

  • RİBATEK PAPER FACTORY

Çerkezköy/Tekirdağ (2008)
Mechanical installation and commissioning of
SPUNLACE paper factory with capacity10.000 t/year